Floor replacements and Welding issues

Old Sep 21, 2007 | 07:33 PM
  #1  
buckmaster's Avatar
Thread Starter
|
1st Gear Member
Joined: Jul 2007
Posts: 141
Default Floor replacements and Welding issues

Have a handful that I will start playing with this winter. Needs all floors, rockers and more. Questions are: When mig welding, is it true to only weld short beads in 6-10 inch increments to avoid heat? Any advantage to the one piece floor? I am inclined to leave the driveshaft tunnel alone since it is in great shape, and also to provide a factory reference point as well as maintaining structural support. Anyone that is advanced in this field may also have an opinion as to the best sequence of part replacement (rocker, quarter, floor). Thanks folks.
 
Old Sep 21, 2007 | 09:06 PM
  #2  
JRs72RS's Avatar
February 2009 ROTM
Joined: Jan 2007
Posts: 411
ROTM Winner's Club
Default RE: Floor replacements and Welding issues

If you are new to welding sheet metal, it is best to be very patient to start. Take extra time to tack in the new pans extra good, like tack welds every couple inches. Make certain the original metal has enough thickness to weld properly. Keep the edges of the metal as close as possible and jump around to keep heat from building up in one area. Good clean metal (sandblasted) makes welding easier too. If your floors are not too bad and you don't want to mess with the seat braces then only replace the footwells. If you do replace the entire floor, brace the car good and then brace some more to hold it straight. Basically, take your time!
 
Old Sep 21, 2007 | 09:26 PM
  #3  
buckmaster's Avatar
Thread Starter
|
1st Gear Member
Joined: Jul 2007
Posts: 141
Default RE: Floor replacements and Welding issues

Thanks for that guidance, well received. The bracing is something I want to do as I break this car down. Someone had told me that there was a way to get measurements for certain critical points on the car. Ever heard of this?
 
Old Sep 21, 2007 | 10:34 PM
  #4  
sweet1967camaro's Avatar
In the Staging Lanes
Joined: Dec 2005
Posts: 51
From:
Default RE: Floor replacements and Welding issues

i would definately go with a one peice floor pan. In the end it will save you time, money, and look ten times better. You be amazed how good they look. The one peice will make sure the bodies square and the tunnel is nothing to worry about, it lines up with the front and back good as well.
 
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
jjc1800
67-69 General
1
May 29, 2010 11:19 PM
luciora
93-02 General
0
May 19, 2010 09:02 PM
microkid
General Tech
10
Apr 21, 2007 01:19 PM


Thread Tools
Search this Thread

All times are GMT -5. The time now is 11:30 AM.