project 9 second lt1 (4th gen)
#262
yeah well the one problem is i took my phone surfing for 2hrs (phones+surfing=rob's beat) so ill have to figure somethin out. we have plenty more rings to grind to take pics of. the list of parts needed is now down to like 3 and there's only a few things left to do.
#264
well all 40 (i think thats all) rings are ground and set right. my hands hurt from it but it was new to me and cool. next idk lol i suppose put the rings on the pistons and rods on pistons
#265
Hey guys sorry not much happenin I'm away again. But we got the bearings in plastic gauged crank put in and main caps torqued down and a piston installed on a rod spiral locks rr a *****. Ill post pics wen I get home I'm on the gf phone
#270
well got some well i think alot done last night not as much as i wanted to yesterday though because of some college shopping. we brought the rods and pistons inside and installed all the spiralox we thought that they'd take all night but turn out simple. then we got all the rings on the pistons. fixed our oil ring problem they didnt sit right thats because the diamond pistons came with a ring for the oil groove to fill space. so tonight they go into the block and the cam might too. i got some pics of my dad puttin the spiralox and rings on because i got a new phone.